| | | | | | | Overview | Standard Selling Points : | - Earthquake Code Compliant; with Building Design to highest codal provisions for this zone
- Primary School, Kindergarden and Creche
- Rain Water Harvesting
- Convenience Shopping
- Gated Community
- Cohesive Urban Design to include roads, street furniture, street lighting, paving and signage
- Mini Theatre in the Club House
- Water Features within the Development
- 24/7 and 100 % Power back up
- Solar heating
- Sense of Arrival to Ireo Uptown
- Sense of Arrival to Ireo Uptown
- Sense of Arrival to each Building
- Spacious Ground floor lobby fully air conditioned
- Customer Service Officers at reception area
- Wastewater Treatment Plant State of the Art Membrane Technology for water purification and recycling
- 90% of wastewater recovered as irrigation, cooling make‐up, filter backwash and flushing water the latter to be odourless, free of suspended particles and harmful bacteria, conforming to the highest standards of hygiene
- Separate flushing water pipes
- Gas piping fitted into each property
- Availability of shuttle bus service with covered bus stop to Metro and Ireocity
- Double basement car parking
- Laminated wood flooring to master bedroom
- Wifi in Public Areas
- Fitted baths with contemporary modern fittings
| Disclaimer: All site plans, floor plans, areas, dimensions, specifications etc. are subject to change till final completion of the project. Soft furnishing, furniture and gadgets are not part of the offering.This does not constitute a legal offer. All images are an artistic conceptualization and do not purport to replicate the exact products. The Project is part funded by Axis Bank Limited (the 'Bank'). The Company will provide No Objection Certificate (NOC) / permission of the Bank for sale of flats/property, if required. | | | | Floor Plans | | | | Price List | | PRICE LIST | | Basic Price | As applicable | | External Development Charges (EDC) | Rs. 319 per sq. ft. | | Infrastructure Development Charges (IDC) | Rs. 30 per sq. ft. | | Preferential Location Charges (PLC) | As applicable | | Car parking (per bay) (See note 2) | Rs. 3,00,000 ; (01) Covered Rs. 5,00,000 ; (02) Covered (back to back) Rs. 3,00,000 ; Additional | | Club Membership fee (optional) | As applicable | | Replacement Fund-cum-Maintenance Security (RFMS) | Rs. 50 per sq. ft. | | Booking Amount | 10% of Basic Sale Price |
| | | PLC CHARGES | | 1. | Single PLC | Rs.200 per sq ft | | 2. | Double PLC | Rs.300 per sq ft | | 3. | More than 2 PLC’s | Rs.400 per sq ft | | PLC ATTRIBUTES | | | A. | Floor | G,1,2,3,15 & above | | B. | Green/Landscape/ Lawn | As applicable | | C. | Club/Pool | As applicable | NOTE:
- Prices prevailing at the time of receipt of application for booking shall be applicable.
- Mandatory Car parking(s):
- One bay for apartments
- Three bays for Penthouse
- External Development Charges (EDC) and Infrastructure Development Charges (IDC)
shall include interest and other incidental charges thereon as presently applicable, but does not include any future upward revision by the Haryana Government, Which shall be payment at that time by the Applicant.
|
| | | Payment Plan | PAYMETN SCHEDULE | DOWN PAYMENT PLAN [7 ½ % rebate on Basic Sale Price + PLC + Parking] | | S.N. | Linked Stages | Payment | | 1. | At the time of Booking | 10 % of Basic Sale Price | | 2. | Within 45 days of booking | 85 % of Basic Sale Price + EDC + IDC + PLC + Car parking | | 3. | On Receipt of Occupation Certificate | 05 % of Basic Sale Price + RFMS + Stamp duty & Registration charges |
| | | | CONSTRUCTION LINKED PAYMENT PLAN* | | S.N. | Linked Stage | Payment | | 1. | At the time of Booking | 10% of Basic Sale Price | | 2. | Within 45 days of Booking | 10% of Basic Sale Price | | 3. | On Commencement of excavation | 10 % of Basic Sale Price + 50% EDC + 50% IDC | | 4. | On completion of GF floor roof slab | 7.5 % of Basic Sale Price + 30% EDC + 30% IDC | | 5. | On completion of 3rd floor roof slab | 7.5 % of Basic Sale Price + 20% EDC + 20% IDC + 50% PLC | | 6. | On completion of 8th floor roof slab | 7.5 % of Basic Sale Price + 50% PLC | | 7. | On completion of 11th floor roof slab | 7.5 % of Basic Sale Price + 50% Car parking | | 8. | On completion of 14th floor roof slab | 7.5 % of Basic Sale Price + 50% Car parking | | 9. | On completion of 17th floor roof slab | 7.5 % of Basic Sale Price | | 10. | On completion of Top floor roof slab | 7.5 % of Basic Sale Price | | 11. | On completion of external plaster | 7.5 % of Basic Sale Price | | 12. | On completion of internal plaster | 05 % of Basic Sales Price | | 13. | On Receipt of Occupation Certificate | 05 % of Basic Sale Price + RFMS + Stamp duty & Registration charges | | * Stage for each installment shall pertain to stage for the respective Tower. | NOTE:
- External Development Charges (EDC) and Infrastructure Development Charges (IDC) shall include interest and other incidental charges thereon as presently applicable, but does not include any future upward revision by the Haryana Government, which shall be payable at that time by the Applicant.
- Stamp Duty/registration charges shall be payable along with the last installment based on prevailing rates.
- Prices subject to revision at the sole discretion of the company.
- Third party charges including Govt. charges and taxes, if applicable, shall be extra.
- Club membership fee, if applicable will be payable along with the last installment.
|
| |
| |
| | | | |
|
|
|